Bus stop improvement works are scheduled to commence at Glassford Street, to replace / upgrade the existing temporary bus stop buildout located at the Marks & Spencer side entry/exit doors.
Works shall include removing existing precast concrete kerbs and footway surfacing and replacing with high quality public realm grade materials including granite kerbs and Caithness flagstones. Rainton Construction Scotland Ltd shall undertake the works on behalf of Glasgow City Council.
A traffic management system with reduced road widths will be in operation from Monday 23rd May 2022 for a duration of 4 weeks. This is to ensure the safety of the public and site operatives. As the bus stop shall be closed for the duration of the works, we have made arrangements for a temporary stop to be provided to ensure continued service to users.
Information from Glasgow City Council. Published 23 May 2022